Woodseats toilet block
This building job was based in Woodseats Shefield S8. The old toilet block was falling down had no roof, the brickwork was crumbling and pointing was missing. We put new roof rafters on and covered the roof in breathable felt. We then used the existing slates and had to source some more to cover the roof. The pointing was ground out using a grinder with special blade and repointed with a strong mortar mix. Also all the missing bricks were replaced. We hand made a door from deck boards as the door was very small.