Commercial turfing
This large commercial turfing job was in Totley Sheffield S17. It was a new build site. It involved clearing the bank of weeds which took 2 lots of weed treatments over a 4 week period this would ensure that no weeds were left in the soil before turfing. We then levelled the bank of soil and layed turf there was 650m2 put down. We then pebbled and planted one of the new builds front gardens ready for the site open day.